Twitter: langonej
Published Work

TECHTARGET
- * Troubleshooting VMware View Bottlenecks with VMware AppSpeed
- * How to put the VMware View client on a USB drive with VMware ThinApp
- * Using VMware RAWC to see how VMware View workloads may affect your architecture
- * Reviewing bluelock vCloud Express
- * Reviewing the five official VMware vCloud Express providers
- * 10 virtualization predictions for 2010

VIRTUALIZATION.INFO
- * The Apple iPad Opened the Door for the Real Business Tablets
- * Designing the Virtual Data Center - Part 2: Building Blocks or Bespoke Bits?
- * Designing the Virtual Data Center - Part 1
OTHER SOURCES
Additional Info
User login
Reply to comment
VMware Maintenance Mode Hangs at 2% with, "insufficient resources to satisfy configured failover level for HA."

Tales from the field; while being at a customer site who needed to reboot their ESX hosts (and thus put their hosts in Maintenance Mode), who found that their 2-host cluster hung at 2% while initiating VMware Maintenance Mode, the fix is below:
- Ensure Distributed Resource Scheduling (DRS) is enabled
- The error is generated because the default HA setting is to support 1 host failure. Well, putting 1 host in Maintenance Mode will leave a 2-host VI Cluster unable to support 1 host failure, thus generating the error.
- The fix is to disable Admission Control, which is enabled by default.
- NOTE: I'm not a huge fan of enabling (default) Admission Control in the first place. I prefer to have all of my designated VMs come back after a host failure at <100% performance than have some of them come back at ~100% performance.
- Enter Maintenance Mode.
- Do your goodness, such as patching the host, drinking some whiskey, or watching Formula 1 replays.
- Exit Maintenance Mode.
- Re-enable Admission Control (if so desired).
NOTE: This could also happen in a VI cluster that can not support the amount of hosts in Maintenance Mode. The steps for remediation should roughly be the same.
- Add new comment
- 284 reads
Reply
Accolades






Video
"Green IT" - Leveraging VMware to provide a green datacenter.
Preview of the upcoming VMware View iPad App with PCoIP support.
Ubertechnik 350Z at VIR.
Latest from Disqus
Consulting Gigs
CURRENT GIGS for 1099 VCP's
- * VMware Site Recovery Manager Consultant.
Status: FILLED.
Duration: 3 WeeksLocation: Reston, VA
Clearance: None
- * Senior Solaris Consultant.
Duration: 3+ Weeks
Location: Reston, VA
Clearance: TS SCI
Note: All 1099 consultants must be a current VCP.
